If you use the version date to calculate the workload (this is optional and can be configured in the General Options section of Workload Admin), this feature lets you use this date as the due date for the issues that are included within this version.

This can be used to calculate the workload for issues that have no due date and that are included within a version. Workload will calculate the workload using the version’s due date as the due date for all of its issues.

The two modes of operation are explained below:

Without version date (box not checked)

 

Example:

There are four issues with different due dates and different times remaining


Assume the current date is 27 September

 

With version date (box is checked)

 

Example:

In this example we have ten issues with different due dates and different times remaining associated with different versions:

We have the following versions (version 1 is in Release):

Assume the current date is 27 September